SCADA/
EMS Systems
-bold.jpg) |
-
Fully
redundant master system in SDC to support SCADA
facilities for all EHV, 33/11kV and major 11kV substations and
power stations. This master system is inter-linked to Kuching,
Sibu, Bintulu and Miri RDCs master systems.
-
Four
master systems in Kuching, Sibu, Bintulu and Miri RDCs to
support SCADA facilities for localised EHV, 33/11kV and major
11kV substations and power stations.
-
One
mini master system in Lawas to support SCADA
facilities for localised 11kV substations and power stations.
-
An
Energy Management System with Automatic Generation Control for
power generation optimization.
-
Power
Network Applications including contingency analysis and
optimum load flow to support realtime analytical work for power
network operation.
-
An
Operation Training Simulator for realistic operation hands-on
training.
|
Remote
Terminal Units (RTUs)
|
- More than 100 RTUs are
installed in EHV, 33/11kV and major 11kV substations and power
stations, with a total point counts exceeding 30,000 points
including 5,000 supervisory control points.
|
Substation
Control Systems
|
- Three substation control systems
in Miri area.
|
Communication
|
-
The
fibre optic network covers all the Grid connected Regions. SDH
channels are operating at STM4 (622 Mbps) and STM1 (155Mbps)
level, linking all Despatch Centres, major Power Stations, EHV
Substations and Regional Offices. PDH channels are operating
at 2 Mbps, linking most of the 33KV substations and regional
power stations.
-
The
Micro-Wave Radio link was set up between Wisma Sesco and
Biawak 132 KV substation. The link forms part of the fibre
optic network.
-
The
Power Line Carrier (PLC) network was set up along the EHV
Transmission Lines. All the EHV Substations are linked by PLC
channels. The PLC channels are working on 4 kHz baseband which
can provide analogue speech and low speed data channel (up to
9600bps).
-
The
pilot cable channels can provide the same 4 kHz baseband as
PLC channels but with limited distance (about 20 km).
-
Private
Automatic Exchange (PAX) for SESCO internal telephone network which is used for operations purposes. eg. Despatch Centres,
power stations, regional offices, substations, offices for
operations personnel.
-
Public
Automatic Branch Exchange (PABX): All PABXs have been linked
up via 2 Mbps channels to form a network. The extensions are
installed in regional offices for administrative purposes.
-
Security
surveillance System has been sat up at Kuching Regional
Office. The centre has been monitoring intruder alarms for EHV
Substations in Kuching region and CCTV at customer service
section at Kuching Regional Office. The system will be
extended to other regions in phases.
-
Data
Communication Network (WAN/LAN) has been setup to link SESCO
offices for IS application
-
Network
channel usage support are provided for other applications:
|
|